Construction dust is finer than household dust. It floats, settles on every flat surface, works its way into cabinets and vents, and comes back a day after a quick wipe. That's why a post-construction cleaning is its own service, with its own checklist.
What's included
Our crews work through four groups, room by room:
- Dust removal: fine construction dust from all surfaces, walls and ceilings spot-dusted, vents and air returns cleared, light fixtures and fans dusted, window sills and tracks cleaned
- Debris and residue: construction debris removed, stickers and labels taken off new fixtures and windows, adhesive and residue cleaned, paint specks and splatter removed where it's safe for the surface, outlet and switch plates wiped
- Surfaces and fixtures: cabinets cleaned inside and out, countertops detailed, doors, frames and trim wiped, baseboards detailed, fixtures and hardware polished
- Floors and the final polish: all floors vacuumed and scrubbed, hard floors washed and mopped, glass and mirrors cleaned, and a final walk-through so the space is move-in ready
How it's different from a deep clean
A deep cleaning goes after everyday buildup: grease on the range hood, soap scum on grout, dust on baseboards. Post-construction cleaning goes after what the work left: drywall and sanding dust on every surface and inside every cabinet, stickers and adhesive on new fixtures, and paint specks. It takes extra steps, and it has to reach places a deep clean usually doesn't, like the inside of brand-new cabinets and the tracks of new windows.
When to book it
Book it after all of the work is completely finished, painting and touch-ups included. If a contractor is coming back to finish a punch list, schedule the cleaning after that visit, or the dust comes right back. One thorough visit at the end beats two half-done ones.
When you book, tell us which rooms were worked on and what was done (a kitchen, a bathroom, floors, a full renovation), so we send the right crew and give you an accurate quote.
Getting the house ready
- Put away any tools and leftover materials you want to keep, so they don't get thrown out with the debris.
- Ask your contractor about the HVAC filter. Fine dust gets pulled into the system, and a fresh filter keeps it from blowing back out.
- Point out new finishes you're careful with, like natural stone or a fresh floor coating, so we choose the right products for them.
Renovations are common all over Long Island, from capes being opened up and redone in New Hyde Park to new kitchens and additions in Manhasset. The cleaning is the same careful job in all of them.
What post-construction cleaning costs
On Long Island, post-construction cleaning typically runs $450 – $2,650, depending on the size of the space and how much dust and debris the work left. Quotes are free, our crews are insured, and if something isn't right, tell us within 24 hours and we'll re-clean it free.